Cambria Eden Prairie Exterior Building Renovation Project

Completed in 3 phases. Phase 1 included removal and replacement of existing ribbon windows on 3 floors of 3 sides of the building.

Location

11000 W 78th Street
Eden Prairie, MN 56044

Market Sector

Commercial

Square Feet

64,000 SF

Project Type

Corporate Office

Architect

SKD Architects, Inc

About this Project

SUMMARY

Existing, multi-story occupied office building. Work was done in 3 phases: Phase 1 included removal and replacement of existing ribbon windows on 3 floors of 3 sides of the building. Through-wall flashing, stone headers and sills were added. Phase 2 involved construction of new entrance on west side of building. Traffic using this entrance was diverted to existing east side entrance during this phase. Phase 3 was the completion of work on the east side of the building. All traffic was re-diverted to the new entrance that was completed in Phase 2. Entire new glass curtain wall was installed full height along with new main entrance to the building. New Lobby and main staircase was constructed in the entrance along with all new finishes. Del’s Construction was the Construction Manager on this project and also self-performed the concrete and masonry work.

CHALLENGES FACED

Building occupancy during construction ranged from 150-200 people. Parking, access and noise were all issues to be dealt with. Scheduling was critical with a number of items being done before or after normal working hours or on a weekends. Coordination with Cambria personnel was an every-day requirement on this project.

Get a Quote For Your Project

Further Case Studies

Case Study | Cambria

Cambria Eden Prairie Exterior Building Renovation. Existing, multi-story occupied office building. Completed in 3 phases.

    Eden Praire, MN 56044

   Commercial

    64,000 SF

   Corporate Office

   SKD Architects Inc

Case Study | Shakopee

Shakopee Community Centre and Ice Arena. Masonry work which included interior bearing and non-bearing masonry walls and more.

 

    Shakopee, MN 55379

   Community

    78,000 & 60,000

   Ice Arena & Recreation

   292 Design Group

Case Study | Le Sueur

Multi-phased project. Phase one consisted of the conversion of an existing Dryer Room to a new Cheese Vat Room.

 

    Le Sueur, MN 56058

   Industrial

    9,200 & 3000 SF

   Remodeling

   I&S Group Architects

Get a Quote For Your Project

Client Testimonials

He assisted us in the selection of the architects and contractors and once selected, represented our interests and advised me closely as the project unfolded….. He quickly became well versed in our desired outcomes and was crucial in bringing those to fruition within the scope of the project and our budget…. In a variety of cases, Henry’s advice and representation allowed us to keep costs down without the risk to the aesthetic design integrity or build quality.

Patricia Townsdin

CEO, Minnesota Valley Health Center

Cambria has used Del’s Construction for construction management and various other projects related to building envelopes and manufacturing for more than twenty years…. They are timely with their work and are proactive with anticipating problems and making any necessary adjustments to adapt.

Marvin Barlett

VP of Engineering, Cambria, Eden Prairie MN